“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
According to data from the National Seismological Center at the National Institute of Geophysics, Geodesy and Geography - BAS, at 16:48 an earthquake with a magnitude of 3.5 was recorded in the area of the town of Simitli, near Blagoevgrad. The..
There are significantly fewer homeless people in Sofia in comparison to major European cities. This is shown by data released today from an international study under an international project covering 35 European cities, funded by the European..
The European Commission has approved 70 projects across the EU , worth more than €600 million , to support alternative fuels and reduce vehicle pollution. Bulgaria is participating in two of these projects and will receive funding to install charging..
Bulgaria’s GDP is expected to grow 3% this year, the European Commission said in its Autumn Economic Forecast, as reported by BTA. The projection marks..
On Tuesday, overnight lows will range from 7°C to 12°C, rising to 12–16°C in eastern Bulgaria and around 9°C in Sofia. It will be a cloudy day with rain,..
The European Commission has approved 70 projects across the EU , worth more than €600 million , to support alternative fuels and reduce vehicle..
+359 2 9336 661