“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
The companies of Lukoil will continue to operate with full transparency and fuel supplies will not be interrupted. This is written in a statement from the Russian oil company, signed by the newly appointed special commercial manager..
Svetlan Stoev is the new ambassador extraordinary and plenipotentiary of Bulgaria to Switzerland. The presidential decree was published on November 18 in the State Gazette. Stoev is a career diplomat. He started working at the..
Strong southerly wind on Monday evening led to the diversion of six flights and the cancellation of five others at Sofia Airport. Flights from Malta, Frankfurt, Vienna and Munich landed in Skopje, and from Bergamo and Warsaw - in Varna. Flights to..
Bulgaria’s GDP is expected to grow 3% this year, the European Commission said in its Autumn Economic Forecast, as reported by BTA. The projection marks..
On Tuesday, overnight lows will range from 7°C to 12°C, rising to 12–16°C in eastern Bulgaria and around 9°C in Sofia. It will be a cloudy day with rain,..
The European Commission has approved 70 projects across the EU , worth more than €600 million , to support alternative fuels and reduce vehicle..
+359 2 9336 661