“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
On Saturday the weather will continue cold, predominantly sunny with a temporary increase of mid and high clouds. There will be fog before midday in some parts in the lowlands. There will be a light wind from the East, in the Eastern part of..
Out of all politicians in this country, President Rumen Radev enjoys the highest approval rating – 46.7% , followed by Prime Minister Rosen Zhelyazkov (18.9%), GERB party leader Boyko Borissov (15.9%), National Assembly Speaker Nataliya Kiselova..
For the third year running, the number of young doctors who want to remain in Bulgaria after graduation has been going up, indicate the results of a survey conducted among 224 Bulgarian students who graduated the Sofia Medical University’s medical..
In Plovdiv, experts discuss issues of the food industry, in accordance with the most up-to-date requirements of the Bulgarian and European regulatory..
Education must make children not only knowledgeable but also good people, said Minister of Education and Science Krasimir Valchev at a meeting with His..
More than 550,000 people received support last year under the European programme Food and Basic Material Assistance – packages of staple foods and nine..
+359 2 9336 661