Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Power produced by Kozloduy NPP's Unit 6 temporarily halved

Photo: BGNES

Unit 6 of Kozloduy NPP is temporarily operating at half of its capacity, the power plant has reported. The reason is the shutdown of a pump in the non-nuclear part of the unit. The necessary inspections of the equipment are being performed. The power of the unit will be increased again after it is confirmed that all systems and equipment are working normally. There is no change in the radiation situation on the site of the nuclear power plant.

The other one of Kozloduy's two operating units – Unit 5, is currently not operating because it has been undergoing regular annual repairs.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Sunny but cold Sunday expected in Bulgaria

It will be cold with minimum temperatures between minus 14°C and minus 9°C, in places in the northeastern regions up to minus 16°C, for Sofia - around minus 9°C. On Sunday it will be mostly sunny. Before noon in some places in the plains and..

published on 2/22/25 6:24 PM

March marking the World Day of Rare Diseases takes place in Sofia

Relatives of patients suffering from rare diseases organized a march in Sofia on the occasion of the World Day of Rare Diseases. They call on the state to develop a National Plan for people with rare diseases. The march was attended by relatives and..

published on 2/22/25 6:16 PM

The Bulgarian Government strongly condemns desecration of EC building

The government strongly condemned the desecration of the European Commission building in Bulgaria in a Facebook post. "Attacks against institutions, whether national or European, are unacceptable and contradict the principles of the rule of law...

published on 2/22/25 4:31 PM