Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Kozloduy NPP's Unit 6 switched off for scheduled annual maintenance

Photo: BGNES

Unit 6 of Kozloduy Nuclear Power Plant will be shut down for scheduled annual maintenance as of today, the NPP’s press service has announced.

The maintenance will include preventive technical maintenance and repairs of the equipment and systems to ensure the unit’s safe and reliable operation, as well as stable energy supplies during the autumn and winter period. The reactor will be reloaded with fresh fuel. The maintenance works are expected to be completed by the end of November. Unit 5 of NPP Kozloduy will operate according to the power generation schedule. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

European Public Prosecutor’s Office investigates fictitious mussel farm in the Black Sea

Suspicions of large-scale fraud with EU funds in a project to build a mussel farm in the Black Sea – southeast of Cape Emine in the municipality of Nessebar, have prompted an investigation by the European Public Prosecutor’s Office...

published on 10/20/25 1:59 PM

President of Hungary is on a two-day visit to Bulgaria

President Rumen Radev welcomed Hungarian President Tamás Sulyok in Smolyan. The guest visited the Bulgarian home of Hungarian poet, translator and artist László Nagy in the city in the Rhodopes. On October 20, the two presidents held..

published on 10/20/25 1:36 PM
 Apostolos Tzitzikostas.

Bulgaria, Greece and Romania have finalized a memorandum for joint cooperation on transport projects

Bulgaria, Greece and Romania have finalized a memorandum for joint cooperation on new transport projects, said European Commissioner for Sustainable Transport and Tourism Apostolos Tzitzikostas. He stated that an agreement for the..

published on 10/20/25 11:54 AM