Unit 6 of Kozloduy Nuclear Power Plant will be shut down for scheduled annual maintenance as of today, the NPP’s press service has announced.
The maintenance will include preventive technical maintenance and repairs of the equipment and systems to ensure the unit’s safe and reliable operation, as well as stable energy supplies during the autumn and winter period. The reactor will be reloaded with fresh fuel. The maintenance works are expected to be completed by the end of November. Unit 5 of NPP Kozloduy will operate according to the power generation schedule.
Paul Cameron from London has turned out to be the one millionth passenger for 2024 at Burgas Airport, and his landing turned into a real celebration, BNT reported. He and his wife Cindy arrived on a charter flight from Gatwick Airport and were..
With the votes of GERB-SDS, PP-DB and MRF, the National Assembly rejected the proposal of BSP for Bulgaria that part of the equipment for Belene NPP be used to replace the 3rd steam generator of the 6th unit of Kozloduy NPP, which is constantly failing...
The caretaker government has allowed the Bulgarian military to train Ukrainian soldiers on the territory of NATO member states. The reasoning states that with this decision Bulgaria expresses its support forUkraine, upholds Euro-Atlantic values and..
Caretaker Prime Minister Dimitar Glavchev stated that he will accept a proposal to be caretaker PM again if President Rumen Radev assigns him this..
A new flare-up of the big wildfire on the Greek side of Slavyanka mountain has crossed the border into Bulgaria, extending the perimeter of the fire..
The traditional swim across the Danube River near Silistra will take place at 9:00 am on August 10. Those wishing to participate can register just..
+359 2 9336 661