Unit 6 of Kozloduy Nuclear Power Plant will be shut down for scheduled annual maintenance as of today, the NPP’s press service has announced.
The maintenance will include preventive technical maintenance and repairs of the equipment and systems to ensure the unit’s safe and reliable operation, as well as stable energy supplies during the autumn and winter period. The reactor will be reloaded with fresh fuel. The maintenance works are expected to be completed by the end of November. Unit 5 of NPP Kozloduy will operate according to the power generation schedule.
On October 21, the Ministry of Finance assumed domestic debt and sold government securities for 145 million euros with 3-year maturity. In 2025, the state assumed domestic debt of 1.45 billion euros. Debt of 7.2 billion euros was..
Foreigners often want to pay in euros. The reason is that the goods already have a price in the European currency, the commercial establishments in Kyustendil say. Sellers have some difficulties explaining that this cannot be done..
Today, architecture students from the University of Architecture, Civil Engineering and Geodesy in Sofia are presenting new proposals for integrating the remains of the Roman Villa Rustica into the city's modern urban environment. Their aim,..
In September, Bulgaria was mentioned as a country connected with dangerous food 7 times, indicate data of the European Rapid Alert System for Food and..
The legal heirs of the people who lost their lives during the flooding in the region of Burgas at the beginning of October will receive 15,000 leva (EUR..
A meeting of the coalition partners took place early this morning, during a sitting of the National Assembly, to discuss the possible reformatting of..
+359 2 9336 661