Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Kozloduy NPP's Unit 6 switched off for scheduled annual maintenance

Photo: BGNES

Unit 6 of Kozloduy Nuclear Power Plant will be shut down for scheduled annual maintenance as of today, the NPP’s press service has announced.

The maintenance will include preventive technical maintenance and repairs of the equipment and systems to ensure the unit’s safe and reliable operation, as well as stable energy supplies during the autumn and winter period. The reactor will be reloaded with fresh fuel. The maintenance works are expected to be completed by the end of November. Unit 5 of NPP Kozloduy will operate according to the power generation schedule. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria remains among the EU countries with the lowest debt

On October 21, the Ministry of Finance assumed domestic debt and sold government securities for 145 million euros with 3-year maturity. In 2025, the state assumed domestic debt of 1.45 billion euros. Debt of 7.2 billion euros was..

published on 10/22/25 9:19 AM

In the border regions of Kyustendil foreigners already want to pay in euros

Foreigners often want to pay in euros. The reason is that the goods already have a price in the European currency, the commercial establishments in Kyustendil say. Sellers have some difficulties explaining that this cannot be done..

published on 10/22/25 8:50 AM

Ancient villa beneath Sofia set for a new chapter

Today, architecture students from the University of Architecture, Civil Engineering and Geodesy in Sofia are presenting new proposals for integrating the remains of the Roman Villa Rustica into the city's modern urban environment. Their aim,..

published on 10/22/25 8:30 AM