Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.
The possibilities for anti-corruption training for Bulgarian prosecutors, investigators and financial intelligence officers was discussed at a working meeting between Chief Prosecutor Borislav Sarafov and US lawyers Dr. Kevin Carroll..
The political crisis can only be overcome by the return of principles to politics. Parties should clearly understand that their credibility is the key to their success, President Rumen Radev told journalists on the occasion of the upcoming elections...
Exactly 100 years ago, on the 12th of September 1924, St. Alexander Nevsky Cathedral was consecrated . The temple was built with public donations "in gratitude to the Russian people for the liberation of Bulgaria from the Ottoman yoke in 1878", on the..
Defence Minister Atanas Zapryanov has cancelled the air show at the Graf Ignatievo Air Base after an L-39 ZA military transport plane crashed, the..
The Supreme Administrative Court rejected the appeal of the coalition around Ahmed Dogan - "Democracy, Rights and Freedoms - DPS"..
At a Bulgarian-Chinese business forum in Sofia, President Rumen Radev pointed out the advantages of the business environment in..
+359 2 9336 661