Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.
From July 10 to September 14, Bulgaria’s capital will live to the rhythm of Sofia Summer Fest. In tune with the summer season, the events take place outdoors – in South Park II, behind the Earth and Man National Museum. The sixth edition of the..
The Chairman of the Security Services Control Committee, Atanas Atanasov, has summoned its members to a meeting today. A day after the official "yes" to Bulgaria's accession to the eurozone on January 1, 2026, the MPs will hear the..
On Thursday, the lowest temperatures will be between 11 and 19°C. In Sofia it will be 13°C. During the day the cloudiness will be variable, decreasing to sunny over many areas. There will be short showers only in the mountains of..
The ministers of agriculture of Bulgaria, Hungary, Poland, Slovakia and Romania have signed a joint declaration concerning the agricultural aspects of..
Bulgaria reacted swiftly to a forest fire near the town of Kriva Palanka, North Macedonia, which is located near the Bulgarian -North Macedonian border...
The Chairman of the Security Services Control Committee, Atanas Atanasov, has summoned its members to a meeting today. A day after..
+359 2 9336 661