Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.
We are holding talks for a government with the first mandate, GERB Chairman Boyko Borissov told journalists in parliament. He reminded that weeks ago he had appointed a negotiating team comprising Tomislav Donchev, Rosen Zhelyazkov, Raya Nazaryan and..
The Council of Ministers approved the Enhanced Partnership in the field of border security between Bulgaria and the United States and tasked the Minister of Foreign Affairs to sign and deliver a diplomatic note to the U.S. side, said the government..
Interior Minister Atanas Ilkov will attend today's regular meeting of the Justice and Home Affairs Council in Brussels. The first item on the agenda of the meeting of EU interior ministers is the accession of Bulgaria and Romania to the Schengen Area..
By December 31, the road from the Greek side to the Rudozem - Xanthi border checkpoint will be ready, said Christodoulos Topsidis, Eastern Macedonia and..
The Council of the European Union decided that checks at the land Schengen borders of Bulgaria and Romania will be lifted from January 1, the..
'Russia has allocated EUR 69 million for the spread of propaganda and significant interference in the internal affairs of Bulgaria and Romania',..
+359 2 9336 661