Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.
A concert “Folklore Forum” will take place at 7 PM on 27 August on the stage known as “The snail” in the Sea Garden in Burgas. Audiences will be able to enjoy folklore songs and dancing from Bulgaria, Romania and Slovakia. The event, admission..
On Tuesday until noon, sunny weather will prevail over most area. In the afternoon there will be more significant increases in cloudiness over the northern and eastern parts of the country. In places, mainly in North-Eastern Bulgaria, it will rain and..
The Prime Minister of the Republic of North Macedonia Hristijan Mickoski stated that there will be personnel changes in the Joint Multidisciplinary Commission on Historical and Educational Issues between Bulgaria and North Macedonia, MIA reports...
The European Prosecutor's Office in Sofia has seized property as part of an investigation into a project worth 2.6 million euros (5.2 million leva),..
The Prime Minister of the Republic of North Macedonia Hristijan Mickoski stated that there will be personnel changes in the Joint Multidisciplinary..
The migrant pressure on the Bulgarian-Turkish border has decreased by 70% compared to last year, said Chief Commissioner Anton Zlatanov, Director of the..
+359 2 9336 661