Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Bulgaria and Romania to build back-up gas pipeline under Danube

Photo: EPA/BGNES

Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Valdis Dombrovskis: Today is a historic day for Bulgaria

Today is a historic day for Bulgaria. This was what European Commissioner for Economy and Productivity, Valdis Dombrovskis, told journalists before the start of the meeting of the Council of the EU, which is to vote on the final..

published on 7/8/25 12:12 PM

Bulgaria's long road to the euro

The final decisions on Bulgaria's accession to the eurozone on January 1 next year are being voted on today by the European Parliament in Strasbourg and the Council of EU in Brussels after a process that has lasted for decades...

published on 7/8/25 11:25 AM
Paschal Donohoe

Eurogroup confirms euro/lev exchange rate

Eurogroup finance ministers confirmed on Monday that the euro- lev exchange rate would remain unchanged after Bulgaria joins the eurozone. This was announced by President of the Eurogroup Paschal Donohoe. Today, the European Parliament in Strasbourg..

published on 7/8/25 9:35 AM