Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.
An operation by the General Directorate Combating Organized Crime and the Supreme Cassation Prosecutor's Office has uncovered the largest illegal cigarette factory to date, Radio Stara Zagora of the Bulgarian National Radio has..
Albania is extremely committed to security and peace in the region, said the Speaker of the Albanian Parliament, Elisa Spiropali, who is on an official visit to Sofia. After a meeting with her Bulgarian counterpart Natalia Kiselova,..
Bulgaria is a factor in the EU and the region that North Macedonia must take into account, Minister of Foreign Affairs Georg Georgiev said in an interview with bTV regarding the report of the European Parliament from which references to “Macedonian..
Full EU membership is neither the end of the story nor a solution to all problems. Realism and accurate self-assessment must guide important decisions,..
The ministers of agriculture of Bulgaria, Hungary, Poland, Slovakia and Romania have signed a joint declaration concerning the agricultural aspects of..
Bulgaria reacted swiftly to a forest fire near the town of Kriva Palanka, North Macedonia, which is located near the Bulgarian -North Macedonian border...
+359 2 9336 661