Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.
The Embassy of Bulgaria in USA hosted a Fulbright alumni reception . For over three decades, the Fulbright P rogram has played a pivotal role in fostering educational and cultural ties between Bulgaria and the United States. ''Thanks to the..
The National Assembly rejected the no-confidence motion against the cabinet of Prime Minister Rosen Zhelyazkov. This was the fourth motion of no confidence against the government, this time citing ''failure in the environment and water sector''. 83 MPs..
Bulgaria's Ministry of Foreign Affairs issued a statement following the summoning of the Bulgarian ambassador to North Macedonia’s Ministry of Foreign Affairs in Skopje. Skopje lodged an official protest with Ambassador Zhelyazko Radukov, as the..
The ministers of agriculture of Bulgaria, Hungary, Poland, Slovakia and Romania have signed a joint declaration concerning the agricultural aspects of..
Bulgaria reacted swiftly to a forest fire near the town of Kriva Palanka, North Macedonia, which is located near the Bulgarian -North Macedonian border...
The Chairman of the Security Services Control Committee, Atanas Atanasov, has summoned its members to a meeting today. A day after..
+359 2 9336 661