Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.
The National Assembly has introduced a new requirement for state-owned enterprises to implement corruption risk management systems, which will also include appointing an integrity officer. The measure is recommended by the Organisation for Economic..
GERB leader Boyko Borissov said that he did not like budget 2026 and it would be frozen. Speaking to the media in parliament, Borissov said that the Joint Governance Council of the formations in the government, the Prime Minister..
North Macedonian Prime Minister Hristijan Mickoski accused attacked Macedonian Bulgarian journalist Vladimir Perev of staging the attack and self-harm, BGNES has reported. On November 21, in a shop in the center of Skopje, Perev..
+359 2 9336 661