Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Bulgaria and Romania to build back-up gas pipeline under Danube

Photo: EPA/BGNES

Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Protesters demand resignation of Bulgarian Food Safety Agency head

Hundreds gathered in front of the Council of Ministers building in defense of Bulgarian livestock farming and in support of the family from Velingrad whose flock of sheep was threatened with culling. The protesters demanded the..

published on 12/12/24 4:17 PM

Bulgaria and Romania become full members of Schengen

The Council of the European Union decided that checks at the land Schengen borders of Bulgaria and Romania will be lifted from January 1, the Hungarian Presidency of the Council of the EU said. In 2024, checks at the air and sea Schengen borders..

published on 12/12/24 11:55 AM

BG Elves: Russia has paid millions of euro for propaganda and interference in the internal affairs of Bulgaria

'Russia has allocated EUR 69 million for the spread of propaganda and significant interference in the internal affairs of Bulgaria and Romania', reported the websites of 24 Chasa daily and Actualno.com , referring to BG Elves. BG Elves claim to..

published on 12/12/24 11:15 AM