Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Bulgaria and Romania to build back-up gas pipeline under Danube

Photo: EPA/BGNES

Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Week ends with autumn-like clouds and rain

On Saturday, northwesterly winds will bring cooler temperatures across the country. Cloudiness will be variable to significant, with showers and thunderstorms in the mountains and east. Lows will be between 12° and 20°C, 12° in Sofia. Highs will be..

published on 9/13/24 7:05 PM

Ministers of Culture of North Macedonia and Bulgaria: Culture can be the bridge between us

Bulgarian Minister of Culture Nayden Todorov has met in Sofia with his counterpart from the Republic of North Macedonia, Zoran Ljutkov, the Ministry of Culture reported. The two ministers assessed highly the cooperation between the two countries in..

published on 9/13/24 6:06 PM

"Bulgarian embroidery" dress code for the first day of school in Kardzhali

The new school year will begin on September 16 at the "Yordan Yovkov" Secondary School in the city of Kardzhali with a special dress code. Motifs of Bulgarian embroidery will be mandatory for the clothing of all teachers and students in the school..

published on 9/13/24 5:54 PM