The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
Social tensions from 1 July until 30 September this year are estimated at an index of 6.09, meaning “risks that are difficult to control”, on a scale of 1 to 210, indicates a survey by the sociological agency Myara, the Bulgarian news agency BTA..
A meeting of the coalition partners took place early this morning, during a sitting of the National Assembly, to discuss the possible reformatting of the government. Such a change was first made mention of by GERB leader Boyko Borissov after his party..
In September, Bulgaria was mentioned as a country connected with dangerous food 7 times, indicate data of the European Rapid Alert System for Food and Feed (RASFF), BNR’s Vesselina Milanova reports. Over the same period this country has reported..
On Tuesday , the lowest temperatures will be between 2 and 7°C. In the valleys and high fields the temperature can drop to minus 2°C;..
Bulgaria, Greece and Romania have finalized a memorandum for joint cooperation on new transport projects, said European Commissioner for..
The European Public Prosecutor’s Office has carried out searches in the Municipality of Plovdiv and in a company suspected of public..
+359 2 9336 661