An association with lead partner Glavbolgarstroy will have the right to build the section of Struma motorway across Kresna Gorge, the Road Infrastructure Agency has announced.
The cost will be 475 million Leva, VAT excluded. With indirect tax the sum will run to almost 55 million Leva (a little over 28 million euro) per kilometer. This makes the section from Krupnik to Kresna, which is 10.4 kilometers long, the most expensive road section ever built in Bulgaria, BNR’s Marta Mladenova reports. The deadline for the implementation of the project is 4 years 2 months.
The company Glavbolgarstroy was set up more than 50 years ago, and is the first to have developed basic standards in Bulgaria’s contemporary construction industry.
On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed will reach 10-15 m/s. With it, cold air will invade the country and temperatures will drop and by..
"After today's vote for Speaker of the National Assembly, ''We Continue the Change'' (PP) demanded the resignations of Daniel Lorer and Yavor Bozhankov", the party's co-chairman Kiril Petkov wrote on Facebook. Silvi Kirilov, nominated by "There..
In a record-long session lasting 18 days, Bulgarian MPs made a seventh failed attempt to elect a speaker of the National Assembly. After several breaks and a re-vote for the oldest MP, Silvi Kirilov from “There Is Such a People" (ITN), only a few..
The U.S. Department of State today released the data for the refused type B visas for the financial year 2024. For Bulgaria, this percentage is 6.02%,..
At the opening of a business forum in Ho Chi Minh City during his official visit to Vietnam, Bulgarian President Rumen Radev pointed out that Bulgaria..
The Bulgarian Hotel and Restaurant Association (BHRA) presented its annual awards for professional achievements in the field of tourism. The Bulgarian..
+359 2 9336 661