“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
Belgium and the Netherlands will transfer seven Tripartite mine countermeasure vessels to Bulgaria free of charge, Naval News reported, citing the Belgian Ministry of Defence. The decision was approved by the Belgian government on September..
The Russian owner of the cargo ship linked to a supply of ammonium nitrate at the centre of the devastating explosion at the Port of Beirut in 2020 has been arrested in Bulgaria. Igor Grechushkin is wanted by Interpol, along with the ship's captain,..
Bulgaria's President Rumen Radev met with China’s Vice Minister of Commerce Ling Lee to discuss deepening economic partnership. The meeting was also attended by representatives of a Chinese business delegation visiting Sofia for the 18th session of..
Motorway Europe-A6, which is 63 kms. long, has been put into operation. Connectivity between the Orient and Western Europe is now a fact, Minister of..
Bulgaria is ready to down Russian drones. The Northeastern part of the country is actively being monitored, Minister of Defence Atanas Zapryanov..
In order for young people to be adequately prepared for the challenges of contemporary life and the demands of today’s labour market, education needs to..
+359 2 9336 661