“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
The 122 nd anniversary of the outbreak of the Ilinden-Preobrazhenie uprising will be marked on 2 August in the locality Predela with a flower and wreath laying ritual at the monument Ilinden. Razlog municipality has announced that the ritual will..
In the village of Slaveyno near Smolyan, the Union of Thracian Societies in Bulgaria is organizing a National Gathering-Pilgrimage on August 2 and 3. The festival is dedicated to the 122nd anniversary of the Ilinden–Preobrazhenie Uprising and the 145th..
On Saturday minimum temperatures will range between 15 and 23° C., for Sofia 15° C. During the day the weather will be predominantly sunny, cumulus clouds will form around and after midday. There will be rain and thunder mostly in the mountain..
On Saturday minimum temperatures will range between 15 and 23° C., for Sofia 15° C. During the day the weather will be predominantly sunny, cumulus..
Minister of Tourism Miroslav Borshosh has met with mayors from the Black Sea municipalities and the regional governor of Burgas to outline a common..
The base interest rate in the country is being reduced to 1.82% as of 1 August 2025, the Bulgarian National Bank (BNB) has announced. The reduction is..
+359 2 9336 661