“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
The leader of "We Continue the Change", Asen Vassilev, described the selection of Rumen Spetsov as a special manager at Lukoil as a "bad joke". "Rumen Spetsov was appointed to collect taxes, not to manage a refinery. There is a..
The nominated person for special manager for the four companies of "Lukoil Bulgaria" is Rumen Spetsov, Minister of Economy, Petar Dilov, said. "He meets all legal requirements", Dilov added. The decision was discussed at the Security..
We hope that today Bulgaria will receive a derogation from the US sanctions against Russian company Lukoil, such as the one in Germany - for 6 months. This was what Boyko Borissov, leader of the GERB party, said. In anticipation of..
Bulgaria’s GDP is expected to grow 3% this year, the European Commission said in its Autumn Economic Forecast, as reported by BTA. The projection marks..
On Tuesday, overnight lows will range from 7°C to 12°C, rising to 12–16°C in eastern Bulgaria and around 9°C in Sofia. It will be a cloudy day with rain,..
The European Commission has approved 70 projects across the EU , worth more than €600 million , to support alternative fuels and reduce vehicle..
+359 2 9336 661