Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Power produced by Kozloduy NPP's Unit 6 temporarily halved

Photo: BGNES

Unit 6 of Kozloduy NPP is temporarily operating at half of its capacity, the power plant has reported. The reason is the shutdown of a pump in the non-nuclear part of the unit. The necessary inspections of the equipment are being performed. The power of the unit will be increased again after it is confirmed that all systems and equipment are working normally. There is no change in the radiation situation on the site of the nuclear power plant.

The other one of Kozloduy's two operating units – Unit 5, is currently not operating because it has been undergoing regular annual repairs.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Freezing temperatures expected in most regions of Bulgaria on Friday

On Friday, the minimum temperatures in Bulgaria will be between - 20°C and - 5°C. In Sofia, it will be around minus 13°C.  During the day, it will be mostly sunny. There will be a weak, in the eastern regions to moderate wind from the..

published on 2/20/25 7:35 PM

Hackers claim they have data from the Supreme Administrative Court

Hacker group Ransomhouse announced on its website that it has data leaked from the information systems of the Supreme Administrative Court. As evidence, documents with lists of names and personal data of employees, as well as various documents have..

published on 2/20/25 6:38 PM

Bulgarian producers want more farmers' markets

The situation in the country illustrates the urgent need for the state to create conditions for holding more farmers' markets, where farmers can sell their produce directly to consumers. This was stated by the Bulgarian Farmers' Union in connection..

published on 2/20/25 5:31 PM